New Build Factory Extension

Value

£201,800

Client

Textile Manufacturer

Location

Angus

Category
Industrial
About This Project

We carried out the complete lighting and power installations for a 3000 square metre new build factory extension including an 11KV transformer and HV switchgear. The transformer supplied an LV cubicle switchboard which supplied power supplies to various plant, machinery and distribution equipment. The installation was an in-house design and build project with high bay LED lighting installed in the workshop and store areas and surface mounted LED luminaires in the offices, canteen and toilets areas. A trace heating system was installed on the entire length of the 2000mt long sprinkler system including power supplies to high level thermostat controllers and pump house equipment.