East & Old Church Refurbishment

Value

£83,500

Client

Church of Scotland

Location

Forfar

Category
Commercial
About This Project

We carried out the electrical refurbishment of the East & Old Church in Forfar. Dali-dimmable suspended LED luminaires and strip lights were controlled by a Philips lighting control system, via integral detectors and wall mounted scene setting controllers. We wired and connected heating and ventilation installations including supplies to air handling units and heat recovery units within the attic space and boilers, control panels, thermostats, pumps sets and 3 port valves within the boiler house.

A new fire alarm system was installed throughout the entire church with data, sound, PA and AV installations extended from existing systems.