Workshop Relocation

Value

£58,000

Client

United Closure & Plastic

Location

Bridge of Allan

Category
Industrial
About This Project

We relocated an existing toolroom to a new location which included stripping out the existing area, installing cables and containment to various items of lighting, power, TPN & SPN machinery. We installed new distribution boards in the area and a 400A capacitor installation, with CT’s connected to the incoming supply, to improve power factor correction. We also carried out inspection and testing of the various main switch boards and sub-main power infrastructure cables throughout the factory.