£170,000
Delson Contracts
Montrose
We installed SWA supply cables from existing cubicle switch boards and distribution boards to local switch fuses and machinery, up to 250A. We installed industrial TPN intake/extract ventilation systems, TPN, SPN and 110V supplies to test cell, test bench and test pit equipment. An external lighting system incorporating wall mounted and column mounted luminaires controlled from photocells, timeclock and contactors was installed and PA, data and fire alarm systems were installed throughout the entire site. Much of this work was carried out at a height exceeding 14mt using mobile equipment access platforms which our employees are fully trained and qualified to use.