01 Jan Needle Punch Line

We carried out alterations to the existing 11KV private ring main network to allow the installation of a new 2MVA transformer to supply a Needle Punch Line. A 3000A LV switchboard was supplied from the new transformer which in turn supplied various sections of the...

Read More

01 Jan NOV Topdrive

We installed a new distribution system comprising two 1250KVA generators which supplied a 3000KVA step up transformer from 400V to 660V which in turn supplied a 660V main switchboard, VFD, SCR & MCC control panels. 600mm single core cables were installed on ladder rack containment...

Read More

15 Mar Tom Johnston Road Alterations

We installed SWA sub-main cables from existing main switch boards and panel boards to local distribution equipment and machinery to in-turn supply new Forel and Bystronic Lines. We installed ladder rack containment and SWA power supplies from distribution equipment to local machine control cabinets with...

Read More

10 Apr Textile Machine Supplies

We installed an 11KV circuit breaker to protect a 350mt run of HV cable, supplying a new 2.5MVA transformer. This transformer supplied a 4000A cubicle switchboard which in turn supplied a large textile machine. 630mm single core AWA sub-main cables were installed from the transformer...

Read More

05 Apr New Build Factory Extension

We carried out the complete lighting and power installations for a 3000 square metre new build factory extension including an 11KV transformer and HV switchgear. The transformer supplied an LV cubicle switchboard which supplied power supplies to various plant, machinery and distribution equipment. The installation...

Read More

05 Apr Extrusion Line Machine Supplies

We carried out alterations to the existing 11KV infrastructure to accommodate the installation of additional HV switchgear and transformers. HV ring main units and circuit breakers were extended from existing switchboards to supply new transformers with new HV sub-mains cables being installed throughout the factory...

Read More

05 Apr Grass Yarn Machine Supplies

We carried out alterations to the existing 11KV private ring main network to allow the installation of new HV transformers to supply two Grass Yarn Machines. Two LV switchboards were installed with separate incoming main switches, supplied from two individual transformers and were linked with...

Read More

02 Apr 11KV Transformer & Switchgear

We installed a 500KVA transformer, HV ring main unit and HV circuit breakers c/w 11KV supply cable and earth fields, extended from the existing incoming supply, to increase the maximum load power capacity of the site. 630mm single cables were installed from the transformer to...

Read More

26 Jun Hartwood Home Farm

We replaced and upgraded the existing farm infrastructure incorporating the main switch-board, TPN and SPN distribution boards, mains and sub-mains SWA cables. A 300mA RCD unit was fitted to the main switch disconnector and SWA cables were installed at a depth of 1mt underground, in...

Read More

10 Apr Workshop Relocation

We relocated an existing toolroom to a new location which included stripping out the existing area, installing cables and containment to various items of lighting, power, TPN & SPN machinery. We installed new distribution boards in the area and a 400A capacitor installation, with CT’s...